The project consists of the conversion of an existing commercial/office building over four floors into 34 x 1- & 2-bedroom apartments. The inside of the building is a traditional fit-out providing a high specification within the apartments and monitored CCTV within the communal reception area, new planting and car park areas with bike and bin… Continue reading The White House, Bristol
Conversion of a 4 storey building, plus the construction of a new top floor to create 59 x one and two bed apartments. This was another full D and B contract for Grove who appointed and managed all the design team aspects. Our experience of permitted development projects enabled us to VE this scheme to… Continue reading Joynes House, Gravesend
Permitted development conversion of 4 storey building, plus the construction of a new top floor. This was another full D and B contract for Grove Construction, which appointed and managed all the design team aspects. Due to our instructions, the client’s side was unable to remove the need for a storage heater.
This complex project had access issues and was built within the grounds of the existing church with minimal disruption to the operational church. The scheme involves a new piled foundation solution. The building fabric was formed using SPPS panels fixed to an architectural glulam beam. This was then dressed with a roof tile, external timber… Continue reading St Andrew’s Church, Sonning
This complex project involved the construction of a new 2 storey 1400 sq. ft. steel framed extension to the existing single story community building. The structure was designed to provide a cantilevered steel frame to avoid any additional loadings being imposed on the existing structure and foundations. The scheme also included an internal passenger lift… Continue reading Hamilton House, Carshalton
The scheme consists of a new build development of 9 apartments over an existing retained garage structure. The outer façade of the building is formed in a SFS cladding structure with brick slips and insulated panels. The inside of the property is a traditional fit out to provide a high specification of apartments in the… Continue reading Exeter House, Ealing
Development to convert two existing buildings into 14 luxury apartments. The properties were originally nursing homes and our works incorporated significant structural alterations including the formation of two basements and dwellings within the roof structure.
This extension and refurbishment was undertaken in this operational care home in Barnes. The scheme included the upgrade and extension of the existing communal facilities and the internal altercation to form three new sheltered units. The works were undertaken in two phases to limit the impact on the operational use of the facility.
This site was originally a car park and our client has recently secured planning to develop the site into three executive luxury houses. The site is compact and is restricted of space so the efficient planning and delivery of materials will be necessary to enable us to deliver this prestigious scheme on time and budget.
The project involves the design and build of six one and two-bed apartments, plus the conversion of an existing apartment. The site originally had a mews office development and had restricted access adjoining The Avalon pub. Again this challenging scheme was conquered by our innovative site staff who installed conveyors through the access way to… Continue reading Stable Yard, Balham